Home References Crust Removal

Crust Removal

Biogas plant Radovesice, Czech Republic

  • BGP 844 kW
  • Secondary fermenter volume of 3 450 m3, fermentation temperature 41°C
  • The crust thickness of 3 m consisting of unfermented maize silage
  • Application of the preparates on 21st January2019 – in process (stirrers reparation)

Biogas plant Slativa Czech Republic

  • BGP 549 kW
  • Primary fermenter volume of 2 090 m3, fermentation temperature 42°C
  • The crust thickness of 2 m consisting mainly of unfermented straw
  • The total time of dissolution of the crust: 4 weeks

Biogas plant Velešovice, Czech Republic

  • BGP 637 kW
  • Final digestate fermenter with a capacity of 5,000 m3 
  • The crust thickness of 1,5 m consisting mainly of leftovers of unfermented silage of the GPS
  • The total time of  crust decomposition: 6 months - product dosage by the main fermenter

Biogas plant Turá Lúka, Czech Republic

  • BGP 1 MW
  • Primary fermenter volume of 4 000 m3, fermentation temperature 40°C
  • The crust thickness of 1 m consisting mainly of unfermented maize and grass silages
  • The total time of  crust decomposition: 2 weeks

Biogas plant Opava-Kylešovice, Czech Republic

  • BGP 550 kW
  • Secondary fermenter volume of 2 700 m3, fermentation temperature 43°C
  • The crust thickness of 2 – 3 m, consisting mainly of unfermented straw
  • The total time of dissolution of the crust: 4 weeks

Biogas plant Smolinské, Slovakia

  • BGP 1,0 MW
  • Secondary fermenter volume of 2 700 m3 fermentation temperature 42°C
  • The crust thickness of 3 – 5 m, consisting mainly of unfermented maize silage, grass silage and straw
  • The total time of dissolution of the crust: 5 weeks

Biogas plant Novosedly, Czech Republic

  • BGP 600 kW
  • Primary fermenter volume of 2 700 m3, fermentation temperature 42°C
  • The crust thickness of 0,5 m consisting mainly of unfermented grass silage
  • The total time of dissolution of the crust: 1 week
Biogas News
New product: Axiase 100
16.01.2013

New enzyme product, Axiase 100 is now available for customers in the Czech and Slovak Republic.

Activated Carbon
03.01.2011

Activated carbon for biogas desulphurization.

all articles
Contacts
NovaEnergo s.r.o.

Nám. 14. října 1307/2
150 00 Praha 5

+420 777208020
stambasky@novaenergo.cz

  

show on the map